BALFORD UKRAINE LLC
ALTERNATIVE HYDROPOWER
Stryi river, Dovhe-Hirsʹke village
Modern technologies and investments in the future
Balford Ukraine LLC is creating an investment and environmental project for the construction of an innovative 2 MW HPP on the Stryi river, Dovhe-Hirsʹke village, Lviv region.
About the company
Pre-project solution with the possibility of transport moving up to 3 tons. With the opening of a sandy farm, it will be possible to wash the bottom of the river. It is planned to build a modern ecological fish ladder, that will be built on the recommendation of the National Academy of Sciences of Ukraine.
News
This section contains all the main news
and company events
Ecology
This section contains all the main news on ecology and natural resources
Conclusion from the environmental impact assessment
05/17/19 The Department of Ecology and Natural Resources of the Lviv Regional State Administration gave a positive assessment of Balford Ukraine LLC for the environmental impact of the planned activities on the Stryi river, located near the Dovhe-Hirske village, Drohobych district, Lviv region.
Repair of the bridge over the Stryi river
Balford Ukraine LLC helped the residents of the Dovhe-Hirsʹke village, Drohobych district, Lviv region to repair the bridge over the Stryi river.

As a result of the storm, in March 2019 the bridge was partially collapsed. Now the bridge is repaired and it is functioning properly.

Photo "Before", Photo "After".
Small hydropower: German-Austrian experience
Small hydropower: German-Austrian experience of Balford Ukraine LLC: "How we got to Germany", "Hydropower evolution", "Austrian impression" and more.
The first in Ukraine hydroelectric power plant of a new type in the Dovhe-Hirsʹke village
The first in Ukraine hydroelectric power plant of a new type will be built in the Dovhe-Hirsʹke village

On March 12, 2019, a public hearing was held in the Dovhe-Hirsʹke village on the environmental impact of the construction of a 2 MW hydroelectric power plant. See the results and conclusions in the presented article.
Signing a social agreement on the development of the Dovhe-Hirsʹke village
Road planning for the Sopit village
Construction of a pump room for drinking water supply
Repair of the roof of the Narodny dim: in the process of restoration, summer 2019
Unique pump room opened near the Dovhe-Hirsʹke village (Video)
On September 29, 2019, the 15th traditional procession to the Heroyiv Nebesnoyi sotni mountain took place in the Dovhe-Hirsʹke village. It is the highest peak of the Drohobych region. This year the procession was reinforced by an important event, namely the installation of a pump room at the foot of the mountain. Now everyone can try the water endowed with unique medical qualities which is called "Naftusya".

Balford Ukraine LLC joined the construction of the pump room in the Dovhe-Hirsʹke village and intends to implement a hydroelectric power plant construction project ithere.

24.04.2018 Dovge. GES. Norway Embassy in Ukraine
Львівська ОДА. Група норвезьких консультантів, Балфорд Україна. Проект 2MVT + 2 MVT